Project Name & Location
Virginia Beach City Schools
Kempsville Middle School &Lynnhaven Middle School,Virginia Beach, Virginia
Nature of Firm’s Responsibility
Verification of As-Built Conditions,Roof Replacement Design Servicesand Project Construction Management Services
Completion Date
Sept, 2004
Estimated Cost (In Thousands)
Entire Project: $ 1,280,000.00
Work for Which Firm Was/Is Responsible: $1,280,000.00
In February, 2004 we were requested by Rodriguez Ripley Maddux Motley to provide assistance with the roof replacement design of two schools (Kempsville Middle and Lynnhaven Middle) for the Virginia Beach City Public School System.
Verification of existing as built conditions was completed with in a one (1) week time frame for each building and the contract drawings were developed within four (4) weeks so that the Owner could advertise the projects in March / 2004 and contracts could be awarded prior to the release of school.
The Kempsville Middle School project was 126,027 square feet in size and had an existing gravel surfaced asphalt built-up roof system in-place. The replacement system was designed to include new tapered high thermal insulation mechanically attached and a new twenty year NDL guaranteed built-up roof system.
The Lynnhaven Middle School (approx. 33,500 square feet) had two existing roof systems in place that would require removal prior to the installation of the new roof. The replacement system was also designed to include new tapered high thermal insulation mechanically attached and a new twenty year NDL guaranteed built-up roof system.
The projects are currently being bid and will be awarded within 2-3 weeks with anticipated completion by September, 2004.pproximately 20,000 square feet of Tectum deck replacement due to the explosion damages and interior protection underdeck tarping installation to protect the contents of the building.The roof replacement on this project was completed on time and within budget. The roof replacement cost came in at approximately $12.00 per square foot and our design and administration fees were less than 4%.